Lantronix welcomes Uplogix! Learn more here.

power

Updated March 1, 2022. Written for LMS Version 6.2.

Manages power from the device's perspective. The power controller must have been previously configured. Multiple outlets are supported to facilitate devices with multiple power supplies.

Following power cycle, the device is checked against a number of measures to assure power cycle was a success. Following power off, console status is checked to make sure device has completely shut down, identified by console electrical signals. Following power cycle or power on, POST (Power On Self Test) takes up to five minutes to time-out if an error has occurred.

Rules can be defined to automate this operation using the powerCycle, powerOff, and powerOn actions.

Command availability

CLI resource: port, modem

Device makes: All

Modem: All

Power controllers: All

Lantronix Local Managers: All

LMS offerings: All

Syntax

power <on | off | cycle ["delay"]>

The optional delay is in seconds.

Usage

[admin@LantronixLM (port1/1)]# power cycle
Powering off outlet(s) [1, 2]
DSR was active.
CTS was active.
CTS is still active.
Powering on outlet(s) [1, 2]
Serial link is active.
Reading post
Image decompressed
Device loaded
Post complete.
[admin@LantronixLM (port1/1)]# power on
Powering on outlet(s) [1, 2]
Serial link is active.
Reading post
Device loaded
Post complete.

During a terminal pass-through session, you can use the ~p command in the same way.

History

--

Related commands

  • on
  • off

Not finding what you're looking for?

The LEVEL Technical Services team is standing by 24/7/365 to answer any questions you may have about the installation, configuration, and usage of our products.

© 2024 Lantronix, Inc. All Rights Reserved